Fee Schedule

PINAL COUNTY DEVELOPMENT SERVICES – COMMUNITY DEVELOPMENT NEW AQUIFER PROTECTION FEE SCHEDULE EFFECTIVE DECEMBER 2, 2023

SERVICESFEE
Type 4 General Permits (4.02 through 4.22) – First Type 4 general permit$1,200.00
Type 4 General Permits (4.02 through 4.22) – Each additional Type 4 general permit on the same Notice of Intent to Discharge$500.00
Type 4 General Permits (4.02 through 4.22) – Maximum fee$3,700.00
4.23 General Permit: 3,000 to less than 24,000 Gallons per day Design Flow

Onsite wastewater treatment facility with up to:
  • Three treatment technologies and disposal methods consist of technologies or designs that are covered under other Type 4 general permits; and two onsite wastewater treatment facilities.

$3,600.00

4.23 General Permits: 3,000 to less than 24,000 Gallons per day Design Flow

  • Each additional onsite wastewater treatment facility is on the same Notice of Intent to Discharge up to the maximum fee.

$1,200.00

4.23 General Permit: 3,000 to less than 24,000 Gallons per day Design Flow

  • Each additional treatment technology or disposal method consists of technologies or designs that are covered under other type 4 general permits on the same Notice of Intent to Discharge up to the maximum fee.

$500.00
4.23 General Permit: 3,000 to less than 24,000 Gallons per day Design Flow maximum fee (cumulative)$7,500.00
4.23 General Permit – Annual report required under A.A.C. R18-9-E323 (G)
$200.00

Alternative Design under A.A.C. R18-09-A315 – A design requiring an interceptor (per interceptor)

$250.00

Interceptor under A.A.C. R18-9-A315 – A design requiring an interceptor (per interceptor)
$100.00

Transfer – Transfer of discharge authorization

$50.00

Subdivision Review and Approval (conceptual approval to ADEQ)
$1,000.00
Refuse Solid and Liquid Waste hauler
$200.00
ADWR Domestic Well Approval
$200.00
ADWR Domestic Well Site Evaluation per hour
$130.00
Field or office service fee per hour
$130.00
Onsite Investigation per hour
$130.00